Monthly Archives: February 2011

2011 Build Season Video

The CyberCards are proud to present the 2011 build season video which will also serve as our Chairman’s Award submission. Many thanks to Mentor Tony and PR/Awards/Safety Captain Tia for putting this together.

Rate this:

Posted in Uncategorized | Leave a comment

Post-Ship Day

Having said farwell to our (yet-to-be-named) robot, the team veterans took a road trip today. First, we visited one of our sponsors, Fab2Order. Jason Greeson, the president, is always accommodating to us and seems happy to give tours. It certainly … Continue reading

Rate this:

Posted in Uncategorized | Leave a comment

Fun on the Day before Ship

All we really have to say is this:

Rate this:

Posted in Uncategorized | Leave a comment

Learning about Belts

The weekend was all about the lift.  We got our KOP shipment of Gates belts & pulleys in Friday afternoon, so Saturday and Sunday were spent designing the drive portion of our lift. First of all, a brief description of … Continue reading

Rate this:

Posted in Uncategorized | Leave a comment

More frequent updates

To check our progress feel free to follow my Twitter feed – @taylor1529

Rate this:

Posted in Uncategorized | Leave a comment

Not quite up up and away yet

Design is iterative, right? Looks like we’ve got some 1-day iterations to do.  Floor loader wouldn’t pick up under its own power.  As light as those manipulators are, we thought it would be a breeze, but the denso motor is … Continue reading

Rate this:

Posted in Uncategorized | Leave a comment

Belts are on the way.

Maybe they’ll even make it to the robot before ship. Got an email from a gentleman at Gates that said they were going to send via air our belts and pulleys.  If they come tomorrow, that means we’ll have full … Continue reading

Rate this:

Posted in Uncategorized | Leave a comment